Assembly:
1. The product flows from the previous process to this production line
2. High temperature furnace solidification
3. Cooling furnace quickly reduces product temperature
4. Automatic cleaning and dust removal
5. Vacuum gluing (solves the problem of bubbles in the glue, allowing the glue to be filled uniformly, with a flat surface and complete internal filling)
6. High temperature furnace curing (accelerating adhesive curing)
7. Cooling furnace (quickly reducing product temperature)
8. The product flows to the next stage of the process
Detection:
Visual inspection and resistance testing
All workstations are controlled by PLC, interchangeable, and each job process has MES traceability function