Assembly:
1. AGV trolley stocking products to the production line
2. Loading from the hoist
3. The mechanical arm takes and assembles (replacing the heavy labor of the operator)
4. Vacuum alignment and bonding
5. High pressure defoaming
6. Manual cutting
Detection:
Visual inspection
All workstations are controlled by PLC, interchangeable, and each job process has MES traceability function& Nbsp