Assembly:
1. AGV carts prepare products for production on the production line
2. Use a stacker crane for loading (replacing heavy labor of operators)
3. Manual product assembly
4. Three axis dispensing machine for gluing (sealing the gaps between product shells)
5. Automatically screw and lock the product housing (precise positioning, controllable torque)
6. Laser marking of products
7. Product cleaning and dust removal
8. Automatic labeling
9. Automatic packaging machine for product packaging
10. Use a stacker to stack products neatly
11. The AGV trolley transports the product to the next stage of the process
Detection:
Visual inspection, airtight leakage testing, and final product testing
All workstations are controlled by PLC, interchangeable, and each job process has MES traceability function