Assembly:
1. AGV carts prepare products for production on the production line
2. Loading from the hoist
3. The mechanical arm takes and assembles (replacing the heavy labor of the operator)& Nbsp
4. Mechanical arm for product soldering (replacing manual hazardous operations)
5. The automatic screwing machine locks the product housing (precise positioning, controllable torque)
6. Preheating the product with a preheating furnace (before pouring glue, the product is heated with a preheating furnace to improve the fluidity of the glue in the product cavity and facilitate penetration and filling of various gaps in the product cavity)
7. Vacuum gluing (solves the problem of bubbles in the glue, allowing the glue to be filled uniformly, with a flat surface and complete internal filling)
8. High temperature furnace curing (accelerating the effect of adhesive curing)
9. Cooling furnace (quickly reducing product temperature)
10. Unloading by the hoist
11. The AGV car delivers the finished product to the next process
Detection:
Acceleration testing, electrical performance testing, NFC, visual inspection, and final product testing
All workstations are controlled by PLC, interchangeable, and each job process has MES traceability function& Nbsp& Nbsp